Search Again

2 pages found contatining expressions required.

8 CCD-INFRARED sensors Wheel Alignment for cars, LCVs

  • /English/wheelalignments/iwa81r/wheel-alignment-iwa81r.html

Computerized wheel alignment system with 8 infrared CCD sensor heads for total check of vehicle geometry (passenger cars and LCVs). Equipped with low-latency multichannel radio transmission system in wireless version on 2,4GHz industrial radio frequency, ready-to-use system (set up not needed)...



Summer Shutdown 2013

  • /English/news-article/112/summer-shutdown-2013.html

Giuliano Industrial S.p.A will be closed for summer holidays since 05/08/2013, and until 26/08/2013. We'll be back in office on 27/08/2012, with the following working hours: Monday to Friday, 8:00 to 12:30 AM - 2:00 to 5:30 PM.